So, we have to convert files in the SOLIDWORKS file format. We use these files for the project as reference files. As all the customers have not the same software so they store file in standard file format. Sometimes customer sends data in the standard file format. Schedule task to import other files into SOLIDWORKS Files.ģ.Allows you to auto convert with time saving Report contains General Information aboutĭetails contains all File List as shown in fig 6 Open Task Scheduler > Double click on the status of task from task window as shown in fig 5 SOLIDWORKS Task Scheduler Report includes General Information and Details about executed task. Step 5 – Check the completion of task in Task scheduler window. Task will be executed on a specified time. Step 4 – Set Running mode as once or weekly or monthly, time for printing and finish the task setting. These settings are time and will continue for scheduled task. Step 3- Click on Options and do settings for print as sheet size, portrait or landscape, name of printer, number of copies, etc Repeat same procedure to add more folders.Under File type give file extension to print file.Step 2- Add File or folder to give location of file. As shown in fig 1 Window of Print files will display on screen. So, it is very important to take regular print after release of your document. Task will let you print a group of files later many companies use old drawings print for reference and stores with them so that they could have a hard copy of the drawing information, this gives you a backup that will not be lost with a hard drive crash.Īlso Print of drawings are needed to shop floor for manufacture. Settings for number of files at once will reduce time.You can also choose to use a document’s saved printer settings for each print task.Īuto print of the drawings for further work is automated by single setting. Searching for Task Scheduler from Start menu > All Programs > SOLIDWORKS 20_ > SOLIDWORKS Tools > SOLIDWORKS Task Scheduler. This is time consuming task and boring task. Traditionally you must do opening of files and then save as that file in SOLIDWORKS Part or Drawing file. In last blog we discussed about Convert File, Update File, Update Associated Files. Specify Task Options such as Task working folder, Time out (seconds), and Backup task files.SOLIDWORKS Task Scheduler easy way to reduce manual task Specify export options for the export file type you selected. PDFs that currently exist in the vault are replaced. Create PDFs for drawings that do not currently have them.Īll drawings, replacing existing PDFs. (Adobe Portable Document Format only) Specify one of the following: Specify a location for the exported file on your computer.Ĭopy PDF into vault for View As PDF command. You can output the exported files to a folder you specify, the Workgroup PDM vault, or both.Įxport to local folder. If you select a day of the month that does not exist ( 29, 30, or 31 in some months) no task is scheduled for that month. Tasks scheduled Monthly occur on the same day of the month (1, 2, and so on). Tasks scheduled Weekly occur on the same day of the week (Monday, Tuesday, and so on). Tasks scheduled Daily occur every day from the specified date, including Saturday and Sunday. Each recurring task starts at the specified time of day. The choices are parts ( *.prt,*.sldprt), assemblies ( *.asm,*.sldasm), drawings ( *.drw,*.slddrw), all SolidWorks files ( *.sldprt,*.sldasm,*.slddrw), or all files ( *.*). To filter the files in a project based on type, select a type from the list for each project. To delete a project from the Project list, select the project and click Delete.įile Name or Type. The name of the project appears under Project in the window. Click to open the Workgroup PDM Projects dialog box, select a project from the list, then click OK. Documents in subprojects are included in the print operation.Īdd Project. When the task is finished, the status changes to Completed.Įxport options are available for all file types except JPG by clicking Options. The task and its title, scheduled time, scheduled date, and status appear in the Tasks panel. In the Export Workgroup PDM Files dialog box, set the options described below, then click Finish. Log in with your Workgroup PDM user name and password and the name of the computer with the Workgroup PDM vault. In the SolidWorks Task Scheduler dialog box, click Export Workgroup PDM Files. In Windows, click Start, Programs, SolidWorks, SolidWorks, SolidWorks Tools, SolidWorks Task Scheduler. Export SolidWorks Workgroup PDM files schedules batch export in the SolidWorks Task Scheduler.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |